docs: add orchestration summary with all created tasks and status

This commit is contained in:
wh-leader
2026-05-08 12:58:01 +02:00
parent f252241f9e
commit 8c11722608
+231
View File
@@ -0,0 +1,231 @@
# Portfolio Project Status - Orchestration Summary
**Date**: 2026-05-08
**Orchestrator**: wh-leader
**Task**: t_22a3d7db
**Gitea Issue**: #29
---
## ✅ Orchestration Complete
Successfully decomposed personal portfolio project into **11 atomic implementation tasks** with clear dependencies, assignees, and acceptance criteria.
---
## 📋 Tasks Created
| ID | Title | Assignee | Phase | Priority | Status |
|----|-------|----------|-------|----------|--------|
| t_28db7e16 | [#29-impl-1] Initialize Astro + Tailwind + TypeScript | wh-implementer | Foundation | P1 | todo |
| t_0078b4b3 | [#29-impl-2] Content collections (blog + projects) | wh-implementer | Foundation | P1 | todo |
| t_0ec36bde | [#29-impl-3] Base layout (Header, Footer, Nav) | wh-implementer | Foundation | P1 | todo |
| t_6e85e022 | [#29-impl-4] About page | wh-implementer | Foundation | P2 | todo |
| t_7aa42f76 | [#29-impl-5] Homepage (hero + featured) | wh-implementer | Foundation | P1 | todo |
| t_b7d940a1 | [#29-impl-6] Blog pages + RSS feed | wh-implementer | Pages | P2 | todo |
| t_26ed02cc | [#29-impl-7] Projects pages | wh-implementer | Pages | P2 | todo |
| t_66684b8f | [#29-impl-8] Docker deployment | wh-implementer | Deployment | P1 | todo |
| t_c4e23cc8 | [#29-impl-9] Blog content (5 posts) | wh-writer | Content | P2 | todo |
| t_637198bd | [#29-impl-10] Project case studies (3 projects) | wh-writer | Content | P2 | todo |
| t_8f00b91a | [#29-impl-11] SEO optimization | wh-implementer | Polish | P3 | todo |
**Total**: 11 tasks
**Estimated effort**: 37 hours sequential, ~27 hours with parallelization
**Timeline**: 4 weeks
---
## 🔄 Dependency Structure
```
Foundation (Sequential)
=======================
impl-1 → impl-2 → impl-3
Pages (Parallel after impl-3)
==============================
impl-4 ║ impl-5 ║ impl-6 ║ impl-7
Deployment (Sequential, waits for all pages)
============================================
impl-8
Content (Parallel, independent)
================================
impl-9 ║ impl-10
Polish (Sequential, waits for all pages)
=========================================
impl-11
```
**Critical Path**: impl-1 → impl-2 → impl-3 → impl-8 (16 hours)
---
## 📄 Documentation Created
1. **ARCHITECTURE.md** (15.7KB)
- Complete technical architecture
- Tech stack breakdown (Astro, Tailwind, Docker, Nginx)
- Directory structure
- Deployment strategy
- Content types and schemas
- SEO and performance requirements
2. **IMPLEMENTATION-ROADMAP.md** (9.4KB)
- Task dependency graph
- Phase breakdown with timing
- Critical path analysis
- Assignee profiles
- Acceptance gates (6 gates)
- Known blockers and mitigations
- Success metrics
- Post-launch roadmap
---
## 🎯 Key Decisions
### Tech Stack
- **Framework**: Astro (static site generation, fast)
- **Styling**: Tailwind CSS (design system, dark mode)
- **Language**: TypeScript strict mode (type safety)
- **Content**: Astro Content Collections (type-safe markdown)
- **Deployment**: Docker + Nginx (production-ready)
- **Orchestration**: Portainer (container management)
- **Proxy**: Traefik (automatic HTTPS)
### Architecture Patterns
- **Spanish-first**: All UI text in Spanish (es-ES locale)
- **Dark mode only**: No light mode toggle (simplicity)
- **Static generation**: All pages pre-rendered (performance)
- **Content types**: Blog posts + project case studies
- **SEO-first**: Sitemap, structured data, OG tags
- **Privacy-focused**: No cookies, optional analytics (Plausible)
### Deployment Strategy
- **Host**: 192.168.1.30:3010
- **Domain**: davidaragon.impresion3d.pro
- **HTTPS**: Via Traefik with Let's Encrypt
- **Image**: Multi-stage Docker build (<50MB)
- **Server**: Nginx with gzip, caching, security headers
- **Health checks**: Built-in for monitoring
---
## ⚠️ Known Blockers
### 1. Git Push Authentication
**Status**: BLOCKED
**Impact**: Cannot push commits to GitLab (2 commits staged locally)
**Mitigation**: Commits created locally, will push when SSH key configured
**Action needed**: Configure SSH key or personal access token
### 2. Real Images
**Status**: OPTIONAL
**Impact**: Placeholders for OG image, favicon, avatar
**Mitigation**: Launch with placeholders, replace later
**Action needed**: Create 1200x630 OG image, favicon set, avatar photo
---
## 📊 Success Criteria
### Development (Gates 1-3)
- [ ] All foundation tasks complete (impl-1, impl-2, impl-3)
- [ ] All page tasks complete (impl-4 through impl-7)
- [ ] Docker deployment working (impl-8)
- [ ] Site accessible locally at http://localhost:3010
- [ ] No TypeScript errors, no broken links
### Content (Gate 4)
- [ ] 3-5 blog posts published (impl-9)
- [ ] 2-3 project case studies (impl-10)
- [ ] All content validates against schemas
### SEO (Gate 5)
- [ ] Structured data validates (Google Rich Results Test)
- [ ] OG preview looks correct (opengraph.xyz)
- [ ] Sitemap generated and accessible
### Launch (Gate 6)
- [ ] HTTPS working via Traefik
- [ ] DNS pointing to davidaragon.impresion3d.pro
- [ ] Health check passing
- [ ] Uptime monitoring configured
---
## 🚀 Next Steps
### Immediate (Dispatcher)
1. Dispatcher picks up tasks in `todo` state
2. Promotes impl-1 to `ready` (no dependencies)
3. Assigns to wh-implementer profile
4. Worker executes impl-1 → impl-2 → impl-3 sequentially
### Week 1 (Foundation)
- wh-implementer completes impl-1, impl-2, impl-3
- Gate 1 acceptance: Foundation complete
### Week 2 (Pages - Parallel)
- wh-implementer can work on impl-4, impl-5, impl-6, impl-7 in parallel
- All 4 tasks can be dispatched simultaneously
- Gate 2 acceptance: Pages complete
### Week 2-3 (Deployment)
- wh-implementer completes impl-8
- Test locally before Portainer deployment
- Gate 3 acceptance: Deployment ready
### Week 3-4 (Content)
- wh-writer completes impl-9 and impl-10 in parallel
- Gate 4 acceptance: Content published
### Week 4 (Polish + Launch)
- wh-implementer completes impl-11 (SEO)
- Gate 5 acceptance: SEO optimized
- Manual Portainer deployment to 192.168.1.30
- Gate 6 acceptance: Production launch
---
## 📝 Lessons & Patterns
### Atomic Task Design
- Each task touches 1-3 files maximum
- Clear acceptance criteria (checkboxes)
- One implementer can complete without coordination
- Verifiable in single session (<5 hours)
### Dependency Management
- Sequential where necessary (foundation)
- Parallel where possible (pages, content)
- Clear parent-child relationships in Kanban
### Documentation First
- ARCHITECTURE.md before any code
- IMPLEMENTATION-ROADMAP.md before any tasks
- Both docs committed to repo (source of truth)
### Assignee Specialization
- wh-implementer: Code, infra, deployment (9 tasks)
- wh-writer: Content, Spanish writing (2 tasks)
- wh-leader: Orchestration, planning (1 task)
---
## 🔗 References
- **Repository**: https://gitlab.impresion3d.pro/root/davidaragon-portfolio
- **Gitea Issue**: #29 (Build personal portfolio)
- **Architecture**: /home/caleidos/code_ubuntu/davidaragon-portfolio/ARCHITECTURE.md
- **Roadmap**: /home/caleidos/code_ubuntu/davidaragon-portfolio/IMPLEMENTATION-ROADMAP.md
- **Strategic Plan**: /home/caleidos/code_ubuntu/planificacion_empresarial/ideas/019-personal-portfolio-blog/
---
**Orchestrator**: wh-leader
**Completed**: 2026-05-08
**Status**: ✅ Ready for dispatcher to assign workers